Ita   Eng

Facebook Twitter Linkedin Youtube Instagram

Ergodomus: Timber what's next!?

Modeling and optimization of wood structures: how can you reduce costs and assembly time without reducing the quality?

The structure we are presenting this month is a great example of how off-site prefabrication considerably reduced construction time and costs.

In September and October we will participate to three important events/forums in Venice, UK and Sweden: we look forward to meeting you!

 

Office building in Liguria

In this article we talk about a platform frame building without internal bearing walls. The roof has been realized with off-site pre-assembled elements with more than 12m of span! (read more)

 

Modelling and optimization of timber structures

One of the most important and interesting aspects of the timber engineering process is the analysis of the material’s structural efficiency. Click and see how we reduced the costs of an important building.(continue)

 

Come and meet us!

In September and October we will participate to 3 important events during which timber will be the main actor. We look forward to meeting you there and discuss about how our engineering services can help you! (more)

 

Follow us on LinkedIn!

On our company page you can find a lot of material not available on the website as photographs of works in progress updated in (almost) real time. The platform also allows you to interact with us and other users in a very simple way (more)

 

If you have found this mail in spam, remember to include us as a trusted sender.

P.S.: if you want to contact us don't answer to this mail but click here

 

"If everything you try works, you aren't trying hard enough."
Gordon Moore 

Facebook Twitter Linkedin Youtube Instagram

Do not reply directly to this message, since it was sent from a notification-only address that cannot accept incoming e-mail. Are you sure youre not interested in learning more about timber? Try us out!
Copyright © 2018 Ergodomus, All rights reserved.

<% unsub_eng %>